Portfolio Project

Flowline Construction Project

Date: (2012-2013)

Client: PT Indo Cipta Gemilang

PT Exatra Scope as Engineering Consultant. This Project was development of 5 flowlines located at Klalin Field, Sorong - West Papua.

The project consisted of development of 5 pipe lines from North Klalin2, North Klalin 3, South East Payao well sites to be connected to Existing HGPM Receiving terminal that consisted of 11 km pipeline; and Receiving terminal. The receiving Terminal consisted of Launcher, Receiver, Gas Scrubber and Dehydration Package, all related piping, electrical and instrumentation.